hello welcome to Home Maintenance Rawalpindi & Islamabad my name is Sunny Johnson I am the owner of the company which finishes and renovates buildings I know that professional construction work requires both the right working technique and best products for many years I've been relying on using Sarasate products in my construction and renovation projects services portfolio is full of advanced and easy to use solutions each time I have used sir acid products I was very happy with the final result now service it offers even more that is the professional support for anyone who wants to achieve perfect results visit our web side that will help you to work fast and efficiently now my helpmate is going to show you the main steps of tiling the bathroom of course all surfaces walls and floor are already prepared they are cleaned dry and private bathrooms are exposed to moisture penetration we always start our work with application of the waterproofing system after that we can show tiles installation apart from the wall and floor tiling we will also show how to install mosaic tiles finally we will present grouting and sealing techniques so let's see tiling installation step by step of course sir as it has the right high quality products you need for each step of the bathroom installation preparation make sure that all substrates are free from dirt and dust to strengthen the surface and reduce the absorbency of the substrate prime it with a deeply penetrating primer start with the wharfs for gypsum board walls use Sarah saved CT 17 protein primer for highly absorbing substrates now move to the floor for cement substrates the best choice is CT 17 or set acid cm 94 this primer should be applied and spread with a paintbrush for a roller avoiding the formation of puddles waterproofing all surfaces exposed to contact with water such as walls and floors of showers and their surroundings as well as bathtubs and washbasins areas must be protected by the application of a waterproof sealing system under the tiles the first waterproofing coat is to be applied no sooner than four hours after the priming we recommend to use the one component sealing film set as it's CL 51 which is a flexible liquid membrane together with the Sarasate sealing tape and collar stir CL 51 membrane well before use and then apply it undiluted on the walls starting with critical areas use a steel trowel or a brush being especially careful around pipe inlets for the waterproofing of wall connections and pipes and floor drains place the ceiling color into the first layer and embedded with the second sealing layer of CL 51 continue your waterproofing along the edges and corners of the walls and floor this is all done with the flexible sealing tape and walls and floors around connections pipes and floor drains with the sealing film and tape or color now it's time to also prove the wall under the tiles in the area of wash basin the shower and the bathtub using the liquid membrane CL 51 the first layer should be applied with a brush the second with the brush on a trowel this way all substrate pores will be filled in and the adhesion of the insulating coating improved to achieve an efficient waterproofing two layers of CL 51 should be applied let the surfaces dry for about one and a half hours and then apply the second layer of CL 51 also the floor must be sealed with CL 51 for hours after the application of the second layer the surface is ready for tiling make sure to mark the areas which will be taken by a bathtub or a basin you will leave them free from tidal wall tiling now it's time to fix the tiles and it's best to start with the walls for this prepare cm-12 elastic adhesive motor while working with an adhesive pay special attention to a few things add the right amount of water use the not spreader with the right tubing the choice of two things should depend on the tile size and make sure to follow the package guidelines concerning the adhesive correction and drying time place the tiles pressing them into the mortar the multi coverage in other words the contact area at the back of the tile must be at least 65% keep an equal distance between tiles and make sure they are level remember to leave out the last row of tiles on the walls this should be done after the tiles on the floor are applied so the wall tiles can be fitted in perfectly for fixing bright or translucent natural stone mosaic tiles use a white fast binding tile adhesive to avoid bleeding and discoloration now put the bathtub in its place and also here apply the waterproofing system flow tiling with a heated floor system for installation of a heated floor system you need a highly flexible adhesive which can balance the thermal stresses between tiles and the substrate we recommend to use Set acid CM 17 super flexible or cm16 adhesive water apply the first layer of the mortar then place the heating mat and cover it with the second layer of the adhesive water after the mortar has dried start tiling the bathroom floor apply the mortar on the floor using a suitable notched trowel place the tiles by pressing them into the motor continue to complete the entire floor when the adhesive has dried and the tiled floor is ready to step on apply the missing tiles on the bottom row of the wall as the final tiling step finish the bathtub grouting when the tile adhesive is sufficient to set you may start routing the flexible grout solicit see e-40 aqua static is dedicated especially for bathrooms kitchens and other places in contact with moisture when preparing the grout remember to use the correct mixing ratio with water as defined on the packaging also make sure to observe a three-minute maturing time during mixing completely fill the joint after the crowd has started to set which can be tested with a finger clean the area by wiping it in circular movements with a wet sponge and little water ii cleaning is best done with diagonal movements and clean water installation to mount a mirror on the wall use Sarasate construction adhesive apply the adhesive along the surface creating vertical lines this way water does not collect behind the mirror place the mirror and seal the joints with the sanitary silica to smoothen the joint moisture it with a water and soap mixture and remove the excessive silicone with a plastic spatula continue to seal all joints at the corners of the walls and floor and around bathtubs and wash basins with the Seleucid sanitary silicone in some places like tiled room corners an additional filling may be required in that case use CS 4G expansion joints drink put the string into the expansion joint before performing the final silicone sealing for additional protection and impregnation of the joints you may use the transparent impregnation agent ct-10 cover both the joins and the tiles enjoy the finished bathroom with service it you can be proud of the result of your work it is worth doing the job as if I was doing it for myself prime the surface apply the waterproofing fix the tiles on the wall fix the tiles on the floor grout the 
joints seal with silicone implement 
installation of a mirror.

Comments

Popular posts from this blog